Twinspark OS 0a.0821 - Long Mode Reached


After CPUID checks, Stack setup, Paging, initial GDT and TSS setups, Long Mode checks, Twinspark OS' has finally booted in Long Mode. 

Published: 20th, Sunday, Mar, 2022 Last Modified: 20th, Sunday, Mar, 2022

WebDev Fact...

It takes around 2 months on average to design a website with basic features.